Weep Holes in Masonry: Where They Are Required

A vertical opening left in a mortar joint at the bottom of a brick wall is generally neither an oversight nor a finishing defect. It is a weep hole: a planned outlet to drain water that reaches the back of the masonry veneer to the outside.

In small buildings covered by Part 9 of the Code, the answer is clear: weep holes are required at the bottom of the cavities and air spaces in question, with a maximum spacing of 800 mm. They are also required above doors and windows when flashing must be installed there. In a larger building designed under other parts of the Code, water management remains mandatory, but the exact detail must be verified in the plans and specifications rather than deduced solely from the presence of a small plastic insert.

Mason inspecting weep holes at the bottom of a brick veneer on a construction site in Quebec

The short answer: yes, but not with the same rule for all buildings

Article 9.20.13.8 of the 2020 National Building Code requires weep holes spaced no more than 800 mm apart at the bottom of hollow wall cavities and air spaces or air spaces of exterior masonry veneers. The same provision specifies that this includes spaces above doors and windows for which flashing is required.

This rule is found in Part 9. However, Part 9 specifically targets buildings of no more than three storeys and a building area of no more than 600 m², according to the uses listed in the Code. A large building is not exempt from managing water: it simply falls under a different design framework.

For envelope assemblies governed by Part 5, Article 5.6.2.1 requires that materials, components, joints, and junctions exposed to precipitation be sealed to prevent infiltration or allow precipitation to be drained to the outside. The professional can therefore detail a drained system different from the prescriptive solution of Part 9.

In practice: on a house or small building covered by Part 9, the maximum spacing of 800 mm is a direct regulatory benchmark. On a large project, it is necessary to consult the envelope plans, masonry details, specifications, and professional instructions before asserting whether a façade is compliant or not.

A weep hole is not necessarily a plastic grille

The weep hole is primarily the functional opening that connects the bottom of the cavity to the outside. It can take the form of an open vertical joint, a manufactured vent, a grille, or another device provided in the construction detail.

The mesh insert serves to reduce the entry of insects or vermin while allowing air and water to circulate. Its visual absence does not prove that a weep hole is missing. Conversely, a visible piece of plastic does not guarantee that drainage is working if the back is blocked by mortar or if no flashing directs water to the opening.

The technical sheet from Residential Construction Guarantee on weep holes reminds us of their function and locations. Its regulatory part has been approved by the RBQ, while specifying that the current regulations take precedence.

Why does a brick wall need to drain water?

A brick veneer withstands weather well, but it does not constitute a perfectly watertight surface on its own. A small amount of water can pass through the joints, follow the inner face of the veneer, or come from condensation in the cavity.

The wall is therefore designed as a system with multiple layers of protection. The veneer repels most of the rain. Behind it, the air space provides a drainage area. The membrane protects the frame or support. The flashing collects water at the bottom of the drained area and directs it to the weep hole.

A weep hole without properly placed flashing receives little or no water. Flashing without an outlet can retain water. A cavity filled with mortar debris can short-circuit the system. The entire system must be evaluated, not just the visible hole in the joint.

What Article 9.20.13.8 exactly says

For buildings to which Part 9 applies, the Code establishes two simple benchmarks.

First benchmark: weep holes must be placed at the bottom of the cavities and air spaces in question, with a spacing of no more than 800 mm. This distance is a maximum, not an obligation to space them exactly 800 mm apart. Plans or a specific system may impose tighter spacing.

Second benchmark: the requirement includes spaces above windows and doors for which flashing is required in accordance with Article 9.20.13.3. On a façade with many openings, there may therefore be several local rows of drainage, not just a series of weep holes at the bottom of the wall.

The wording of this rule is the same in the modified Quebec NBC 2015 and in the NBC 2020. To understand which edition of the Code applies to a given project, the ConstruMD guide on the transition of the Construction Code until 2027 explains why the actual start date of the work matters.

Part 9 and large building: the distinction that avoids a wrong conclusion

A project with dozens or hundreds of doors may exceed the prescriptive domain of Part 9. In this case, automatically citing the 800 mm spacing is not enough to judge the entire façade.

The requirements of Part 5 still oblige the envelope to control precipitation. The concept may use open joints, discreet vents, a continuous opening, a specific masonry system, or a detail designed by a professional. The detail may also be partially hidden by the geometry of the lintel or the profile of the flashing.

The right question on a construction site is not just "do we see a weep hole?" You need to ask: what drainage detail was designed, at what elevation, with what flashing, and how was its continuity verified?

How flashing, cavity, and weep holes work together

Flashing is installed at the lowest point of the drained area. It must intercept water descending behind the cladding and direct it outside. The weep hole provides the exit. The cavity must remain sufficiently clear for water to reach the flashing.

Cross-section diagram showing brick cladding, air space, flashing, and weep hole

Above a door or window, the lintel supports the masonry. The flashing manages water above the opening, and the weep holes evacuate it. Caulking around the door frame does not replace this function: it addresses an exterior junction, while flashing and weep holes drain the interior of the assembly.

A quality inspection should therefore verify the continuity of the flashing, its upturns and ends, the position of the weep holes, and the absence of obstructions. The ConstruMD article on quality execution and work inspection explains why these checks are more useful before the details are concealed.

Can the opening be protected against insects and mice?

Yes, provided it does not neutralize the drainage. Vents or ventilated barriers designed for weep holes can limit intrusion while allowing the passage of water and air. The ACQ notably describes mesh vents in plastic or metal and reminds that some models must be oriented correctly.

Filling the opening with mortar, sealant, foam, or a product not intended for this use can block drainage. An intervention intended to prevent a mouse from entering should not create a moisture problem in the wall.

The text of article 9.20.13.8 requires a weep hole but does not prescribe a specific brand or model of insert. The product must suit the designed detail, remain clear, and be installed in the correct orientation.

What to check on a construction site

1. The regulatory framework. Determine if the building falls under part 9 or a design under part 5. This choice changes how the detail is evaluated.

2. The plans and specifications. Locate the wall sections, details at the base of the masonry, lintel details, and specifications on vents, flashings, and membranes.

3. The actual location. Check the weep holes at the bottom of drained areas and above the relevant openings. Under part 9, also compare the spacing to the maximum of 800 mm.

4. The continuity of the flashing. A well-placed opening does not compensate for a missing, too short, perforated, or poorly connected flashing to the membrane.

5. The absence of obstruction. Fallen mortar in the cavity, debris, sealant, and some improvised corrections can prevent water from reaching the exit.

6. The documentation. Photograph the detail before closure, record the location, keep the product sheet, and address discrepancies through a request for information or professional advice.

Construction professionals checking weep holes above doors and windows in masonry

Signs that justify a more thorough check

A facade without a visible opening at the bottom of a drained area, a long distance between weep holes, filled joints above a lintel despite a flashing detail, or obstructed vents deserve a documentary check.

Water stains, efflorescence, corrosion around lintels, brick or mortar spalling, interior stains, and degradation near openings may also indicate a water management problem. However, these symptoms alone do not prove that the cause is a missing weep hole.

The goal of drainage is to reduce prolonged water accumulation in the cavity. Without effective evacuation, moisture can contribute to freeze-thaw deterioration, corrosion, and damage to materials behind the masonry.

Who should intervene when a detail seems missing?

On a new construction site, the foreman or project manager should first compare the execution to the plans and specifications. If the detail is ambiguous, the general contractor must obtain clarification from the responsible professional before closing or correcting the assembly.

The bricklayer-mason executes the masonry detail according to the contractual documents and best practices. The ConstruMD guide on the bricklayer-mason trade broadly presents their role in the construction and repair of masonry works.

In an existing building, joints should not be drilled at random. An improvised correction can damage flashing or a membrane without restoring a functional drainage path. An envelope inspection and an adapted repair detail are preferable.

Frequently Asked Questions

Do all weep holes need to have a visible grille?

No. The weep hole is the drainage opening. It can be left open or fitted with an appropriate vent, depending on the project detail. The absence of a visible insert alone does not indicate that a weep hole is missing.

What is the maximum distance between weep holes?

In assemblies covered by article 9.20.13.8 of part 9, the maximum spacing is 800 mm, or about 31.5 inches. A plan may require tighter spacing.

Are weep holes needed above every door?

Part 9 requires them above doors and windows for which flashing is required by Article 9.20.13.3. In a large building, the detail designed under the applicable part and the professional's plans must be checked.

Can a weep hole be plugged to keep out mice?

A required opening for drainage must not be blocked. A vermin-proof vent designed to remain drainable can be used if the detail and product allow it.

Does a visible weep hole guarantee that the wall is compliant?

No. The flashing, membrane, cavity, spacing, position, and absence of obstruction must also be checked. Compliance is judged on the complete system and the documents applicable to the project.

Key Points

A weep hole is not a hole to be plugged. In small buildings covered by Part 9, it is required at the bottom of the cavities and air spaces concerned, at a maximum spacing of 800 mm, as well as above openings that must receive flashing.

On a large project, the absence of a visible insert is not enough to conclude. Part 5 always requires controlling or evacuating precipitation, but the precise method is found in the envelope plans and specifications.

The useful verification consists of following the path of the water: behind the cladding, in the cavity, on the flashing, then towards a free exit. It is this continuity that truly protects the wall.