Standard
Full Time

Assembly Technician

Posted: Jul 2, 2025

End Date: Dec 30, 2025

Shift

Regular Shift

Installation of prefabricated light steel buildings:

  1. Positioning of walls with the help of the crane
  2. Assembly and securing of walls
  3. Leveling of walls
  4. Installation of floor and roof beams
  5. Installation of metal decking

Our job is to assemble the entire outer shell of the building, as well as all the interior load-bearing walls and structural steel. We essentially do the "rough" part of construction projects and act as a subcontractor rather than a general contractor.

Location

T.M.S. Système Inc.

Member since Jun 20, 2025

Report this project

Ready to Start?

Connect with construction professionals in Quebec.
© 2025 ConstruMD. All Rights Reserved. Designed byJS Template