Standard
Full Time

Specialized maneuver

Posted: May 18, 2025

End Date: Nov 15, 2025

Shift

Regular Shift

Specialized maneuver to assist the excavator operator

For the installation of septic tanks and French drains as well as basement excavation.

Work guaranteed 150 hours for specialized maneuver card.

Location

Report this project

Ready to Start?

Connect with construction professionals in Quebec.
© 2025 ConstruMD. All Rights Reserved. Designed byJS Template